Solutions

A working setup, not just a tester

A cell tester on its own does not produce a result. Each of the six customer types below needs a different chain around it: fixtures, climate, software, calibration and support. Every component in these bundles is a product or service that already appears on this site.

How to choose

Three questions before the first quotation

The bundle follows from the object, the range and the environment — in that order. Skip a step and the configuration is usually revised later.

  1. Start from the object

    Coin cell, pouch, prismatic, module or pack. The object fixes the voltage and current class before anything else is discussed.

  2. Fix the range

    Current per channel decides the series; channel count decides the cabinet; the accuracy class decides whether the µA range is required.

  3. Fix environment and data

    Chamber or All-in-One, then audit trail, LIMS export and the calibration interval. Data requirements are easiest to settle before installation.

Delivery

Delivery lead time

Working days, counted from a confirmed order. The same table applies to every bundle on this page.

Delivery lead time by product type and destination
TypeMainland ChinaOverseas
Standard products 40 working days 80 working days
Non-standard products Standard lead time + 50% (i.e. 60 / 120 working days) Same
  • Counted in working days; weekends and statutory holidays are not included.
  • Counted from order confirmation and receipt of the advance payment.
  • Sea or air freight and customs clearance are not included.
  • The final lead time is confirmed in the quotation / contract.

01 · Academic & research

Universities and research institutes

A new PI, a new laboratory or a grant deadline. The work is coin and small pouch cells, the budget is fixed, and the first paper is the deadline. What delays the first run is rarely the cycler — it is the fixtures, a chamber slot, training and a calibration certificate nobody ordered.

Start-up kit

Academic start kit

Delivery: 40 working days in Mainland China, 80 overseas. Custom fixtures are non-standard and add 50%. See the lead-time table.

Request this bundle

Why these five

The BTS-4008Q is the series most often named in the literature for coin-cell work, so methods from other groups transfer directly. Fixtures, chamber and training remove the three most common causes of a failed first experiment: bad contact, drifting temperature and an incorrectly built schedule.

Related

Cell and battery R&D departments

Cell design iterations, second-source qualification and the handover to a pilot line. The questions are high-power behaviour, formation and whether R&D data agrees with production. The tester is one node in a chain that has to match MES and QA.

Cell to module

Cell R&D line

Delivery: 40 / 80 working days. Non-standard racks, interfaces or fixtures add 50%. See the lead-time table.

Request this bundle

Why this combination

Cell results that cannot be reproduced at module level are a recurring delay in qualification. Pairing the 300 A cell channel with CE-6000 keeps current, temperature and BMS signals under one software version, which makes the R&D-to-production comparison defensible.

Related

Battery materials companies

Incoming material, competitor benchmarking and customer samples. Many similar cells, long cycling, and a report that has to survive an audit. Throughput and repeatability matter more than maximum current.

Throughput

Materials QC bench

Delivery: 40 / 80 working days. Non-standard fixtures and racks add 50%. See the lead-time table.

Request this bundle

Why this combination

A materials lab is judged on whether two batches can be compared. The chamber removes temperature as a variable; the audit trail removes the manual step where data is copied between files; the resistance meter catches incoming material before it reaches a long cycle.

Related

Third-party testing and inspection

Multiple clients, multiple standards, one data set that has to be defensible. Reports leave the building, so traceability is the product — not a feature added at the end.

Traceable

Traceable test bench

Delivery: 40 / 80 working days. Non-standard interfaces add 50%. See the lead-time table.

Request this bundle

Why this combination

An auditor asks three questions: what was the method, who changed it, and how was the instrument verified. Versioned methods, an audit trail and a calibration certificate answer all three from one place. The resistance meter adds a fast incoming screen before cells enter a long schedule.

Related

PACK integrators and storage system teams

Module and pack validation, drive cycles, BMS behaviour and safety. Currents are high, voltages are not negotiable, and a stopped test is expensive. The system has to be specified once and installed correctly.

High voltage

PACK validation system

Delivery: standard products 40 / 80 working days. Pack systems are often configured, so non-standard racks and interfaces add 50%. See the lead-time table.

Request this bundle

Why this combination

Pack testing fails at the joints: a harness that cannot carry the current, a chamber that cannot take the module, or a BMS signal that is logged on a different clock. Specifying pack system, module system, chamber and commissioning together puts those joints under one supplier and one acceptance test.

Related

Solid-state and new-chemistry research

Microamp currents, stack pressure and a dry atmosphere. The measurement is small, slow and sensitive, and the weakest link is usually the fixture rather than the channel. Method development matters as much as the instrument.

µA class

Solid-state method kit

Delivery: standard products 40 / 80 working days; custom pressure fixtures are non-standard and add 50%. See the lead-time table.

Request this bundle

Why this combination

At microamp currents the fixture, the cable and the temperature drift dominate the result. The µA-class channels only help if the stack pressure is repeatable and the temperature is stable, so fixtures and climate are specified with the tester rather than after the first inconsistent run.

Related

Not sure which bundle fits?

Send the cell format, the current range and the temperature requirement. We will answer with a configuration and the lead time that applies to it. No price is published on this site; the quotation confirms both configuration and delivery.

Bundle links carry a reference such as ?bundle=academic so the sales team can identify the requested package. Every component above links to an existing product or service page on this site.

Talk to an engineer

Request a quote