Services

Keep the fleet at spec, not just on paper.

Installation, calibration, spares, training and support — delivered by regional service partners and backed by a defined response commitment.

Systems typically ship in 4 weeks. From there, the service plan follows the instrument through commissioning, calibration cycles and whatever the line throws at it.

Commissioning

Installed, verified, handed over

Commissioning is a checklist, not a handshake. It ends with a record you can attach to the asset.

  1. Site check

    Supply capacity, earthing, cooling and network reach are checked before power-up.

  2. Build and cable

    Racks are assembled and wired to the agreed channel plan, with fixtures and BMS links installed.

  3. Verify channels

    Every channel is exercised for voltage and current before the system is released to your method.

  4. Hand over

    BTS 9.1 setup, user roles, a run on your own protocol and a signed commissioning record.

The first production test should not also be the first trial. We run one of your protocols during handover.

Calibration your quality team can file

CNAS calibration in a laboratory following ISO/IEC 17025, on a schedule you set.

Calibration covers the voltage and current channels in use, against reference standards with traceable certificates. Results are issued as a certificate that states the as-found and as-left condition, so drift is visible rather than assumed.

Labs that run under ISO 17025 can book calibration as a recurring item and hold the certificates alongside their own scope. The interval is agreed with your quality system — we do not impose one.

Calibration can be performed on site or with a return-to-lab arrangement, depending on the model and your region. Scope and lead time are confirmed at quotation.

CertificateCNAS calibration
AlignmentCNAS-accredited laboratory
ScopeVoltage and current channels
IntervalAgreed with your quality system
Typical calibration programme details
Item Typical arrangement Notes
Interval12 months, or per your quality systemShorter intervals are common on production lines with continuous cycling.
Reference standardTraceable voltage and current standardsCalibrated in a CNAS-accredited laboratory.
Certificate contentAs-found and as-left values, uncertaintySufficient for filing with your own ISO 17025 scope.
LocationOn site or return to laboratoryDepends on model, channel count and region.
CoverageChannels in use, by groupChannel groups can be calibrated in production windows.

Typical programme. Interval, scope and certificate format are confirmed in the service agreement.

Spares held close to the line

Regional stock for the parts that stop a test — not a catalogue you have to import from the other side of the world.

Spares are identified by model and serial number, so the right board or module is picked without guesswork. Coverage includes channel boards, power modules, connectors and the consumables that wear on a cycling line.

For multi-cabinet installations we agree a recommended spares list at order, sized to your channel count and the criticality of the test. Customers with an SLA can hold stock locally as part of the agreement.

CoverageBoards, power modules, connectors, consumables
IdentificationModel and serial number
StockRegional hubs
Critical sparesList agreed at order
Spare parts classes and typical dispatch times
Part class Examples Typical dispatch Notes
Channel boardTester module, sense board48 h from regional stockSerial-matched; calibration after replacement.
Power moduleRegenerative stage, rectifier48 h–2 weeksHigher-power modules may ship from the factory.
ConsumablesLeads, clamps, fuses, fans48 h from regional stockRecommended stock list issued at order.
FixturesPouch clamps, prismatic trays1–3 weeksMade to cell format; drawing approval required.

Dispatch times are typical and depend on region and stock. Contractual terms are set in the service agreement.

Training that matches the job

Three audiences, three sessions. Delivered on site or remotely, in your language where a regional partner covers it.

Operators

Daily running: loading samples, starting and pausing schedules, reading alarms and handing over a shift without losing the thread.

Method authors

Building protocols in BTS 9.1 — steps, loops, cut-offs and BMS signals via DBC — plus how to version a method before release.

Maintenance

First-line checks, channel verification and when to call service instead of opening the cabinet. Aimed at your own maintenance team.

Sessions are scheduled around commissioning or a shutdown window. Content and duration are agreed at quotation.

Response times, written down

Support starts remote. Escalation to a field engineer follows when the fault cannot be cleared on the call.

Typical SLA response times by priority
Priority Situation First response (typical) Path to resolution
P1 Line down, no testing possible Same business day Remote diagnosis, on-site escalation where regional coverage exists
P2 Degraded operation or single-channel fault Next business day Remote fix or spare parts dispatch
P3 Planned service, calibration booking 2 business days Scheduled visit or return-to-lab slot
P4 Application and method questions 3 business days Engineer call-back or written guidance

All response times are typical targets, not contractual guarantees. Final SLA terms, coverage hours and on-site attendance are confirmed in the service agreement at quotation. Regional coverage varies by location.

A fault should have a route, not a queue.

Warranty terms are set in your quotation and contract. This section describes how a claim is handled after you raise it.

  1. Send the details

    Model, serial number, affected channel or module, what the system is doing and what changed. Attach a log export or photo where you have one.

  2. Remote diagnosis

    An engineer reviews the record and the symptom, then confirms whether the fault is configuration, software or hardware.

  3. Return or replace

    If hardware is involved, we issue an RMA reference and agree whether a spare ships first or the module returns.

  4. Verify and close

    The repaired or replaced item is verified, and the affected channel group is checked and recalibrated where the measurement circuit changed.

What governs a claim

  • The warranty terms in the quotation and contract, which take precedence over anything on this page.
  • The model, serial number and configuration as shipped, checked against the order record.
  • The installation and commissioning record, where commissioning was part of the order.

What we will tell you plainly

If a fault falls outside the agreed warranty, we will say so before any chargeable work starts. Wear parts, consumables, site conditions and third-party modifications are assessed against the contract, not assumed either way.

What to send with a request

Model · serial number · channel or module · symptom and timeline · log export or photo · site contact.

Response targets are listed under Support & SLA. Warranty period, coverage and freight terms are confirmed in the quotation and contract.

Service questions

Is installation included in the system price?

Installation and commissioning are quoted as a separate line so you can see the scope. It can be included in the order or delivered by a regional partner; either way it ends with a signed commissioning record.

How often should the system be calibrated?

Twelve months is the usual starting point, but the interval belongs to your quality system. Production lines with continuous cycling often choose a shorter interval; labs with occasional use may extend it after reviewing drift history.

Can calibration be done on site?

Where a regional partner and the model allow it, yes. Otherwise the channel modules return to a calibration laboratory. The choice affects lead time and shipping, so it is agreed when the calibration is booked.

Do you service systems bought from another vendor?

Our service scope covers NEWARE systems. Third-party equipment is evaluated case by case, and we will say plainly if it is outside our competence or spare-parts access.

What happens when a channel board fails?

Remote diagnosis confirms the fault, then a replacement board ships from regional stock. After replacement the affected channel group is verified, and calibration is scheduled if the board carries calibrated measurement circuitry.

Can training be delivered in Spanish, French or German?

Where a regional partner covers your language, yes. Otherwise training is delivered in English with translated materials. Confirm the language requirement in your enquiry so it is included in the service plan.

Calibration you can audit

The evidence behind the certificate: a traceable chain, a stated interval, a defined uncertainty and a redacted sample. The certificate number is added when issued.

1 2 3
Each level is calibrated against the level above it; certificates carry the chain of traceability.

Traceable calibration chain

  1. 1Reference standard
  2. 2Working standard
  3. 3Channel under test

CNAS / ISO 17025

Calibration is performed in a CNAS-accredited laboratory whose quality system follows ISO/IEC 17025. The scope covers voltage and current channels; the certificate states as-found and as-left values with uncertainty.

Certificate no. On request

Certificate number and accreditation scope are supplied with the quotation and on request.

Calibration interval and records
ItemTypical arrangementRecord
Interval12 months from the last calibration; shorter intervals on requestAgreed in the service agreement
ExpediteExpedited calibration for production windowsLead time confirmed at booking
ResultAs-found and as-left values per channel groupStated in the certificate
UncertaintyExpanded uncertainty at k=2, by rangeStated in the certificate

Example uncertainty format: ±(0.02% RD + 0.01% FS), k=2. Actual values depend on model, range and calibration point; treat this as an example, not a specification.

What the system can support

Support levels describe test capability, not certification of a completed test. Abuse and mechanical tests are outside the electrical test-system scope.

What the system can support
StandardTitleSupportTypical configuration
IEC 62660-1Secondary lithium-ion cells — performance testingSupported5 V cell channels; 10–1000 Hz sampling; temperature chamber as required
IEC 62660-2Secondary lithium-ion cells — reliability and abuse testingConfigurableElectrical stress and cycling only; thermal and mechanical abuse need dedicated safety equipment
UN 38.3 (T1–T5)Transport testing of lithium cells and batteriesConfigurableT1, T2, T4 and T5 electrical profiles on test channels; T3 vibration and environmental steps require external equipment
ISO 12405-4Electrically propelled road vehicles — test specification for lithium-ion battery packs and systemsConfigurableModule/pack cycler plus chamber; pack-level mechanical and abuse steps are out of scope
SAE J2464Electric and hybrid vehicle battery abuse testingNot supportedAbuse testing (crush, penetration, fire) is outside the test-system scope
GB/T 31484Cycle life requirements and test methods for traction battery packs and systemsSupportedCell, module or pack channels with the cycle profile; chamber as required
GB/T 31486Electrical performance requirements and test methods for traction battery packsSupportedCell and module channels; voltage/current range configured to the pack

Support levels are indicative and conservative. Final scope is confirmed against the configuration, the cell format and the tender documents.

Build the service plan with the order

Tell us your channel count, site location and calibration interval. We return a service scope with response targets, spares list and training plan — typically within one business day.

Talk to an engineer

Request a quote