Operators
Daily running: loading samples, starting and pausing schedules, reading alarms and handing over a shift without losing the thread.
Services
Installation, calibration, spares, training and support — delivered by regional service partners and backed by a defined response commitment.
Systems typically ship in 4 weeks. From there, the service plan follows the instrument through commissioning, calibration cycles and whatever the line throws at it.
Support
Three routes that sit outside the delivery scope below: documents, warranty and a direct line to an engineer.
Current-revision datasheets, quick-start guides and the document library index.
How a claim is raised, diagnosed and closed, and which terms govern it.
Send the model, serial number and symptom; an engineer replies with the next step.
Service scope
Site check, rack build, power and network verification, channel test and a signed commissioning record.
CNAS calibration with certificates your quality system can file, scheduled to your interval.
Board-level spares, modules and consumables, identified by model and serial number.
Operator, method authoring and first-line maintenance sessions, scheduled around commissioning.
Remote diagnosis first, then escalation to a regional field engineer under an agreed response target.
Commissioning
Commissioning is a checklist, not a handshake. It ends with a record you can attach to the asset.
Supply capacity, earthing, cooling and network reach are checked before power-up.
Racks are assembled and wired to the agreed channel plan, with fixtures and BMS links installed.
Every channel is exercised for voltage and current before the system is released to your method.
BTS 9.1 setup, user roles, a run on your own protocol and a signed commissioning record.
The first production test should not also be the first trial. We run one of your protocols during handover.
CNAS calibration in a laboratory following ISO/IEC 17025, on a schedule you set.
Calibration covers the voltage and current channels in use, against reference standards with traceable certificates. Results are issued as a certificate that states the as-found and as-left condition, so drift is visible rather than assumed.
Labs that run under ISO 17025 can book calibration as a recurring item and hold the certificates alongside their own scope. The interval is agreed with your quality system — we do not impose one.
Calibration can be performed on site or with a return-to-lab arrangement, depending on the model and your region. Scope and lead time are confirmed at quotation.
| Item | Typical arrangement | Notes |
|---|---|---|
| Interval | 12 months, or per your quality system | Shorter intervals are common on production lines with continuous cycling. |
| Reference standard | Traceable voltage and current standards | Calibrated in a CNAS-accredited laboratory. |
| Certificate content | As-found and as-left values, uncertainty | Sufficient for filing with your own ISO 17025 scope. |
| Location | On site or return to laboratory | Depends on model, channel count and region. |
| Coverage | Channels in use, by group | Channel groups can be calibrated in production windows. |
Typical programme. Interval, scope and certificate format are confirmed in the service agreement.
Regional stock for the parts that stop a test — not a catalogue you have to import from the other side of the world.
Spares are identified by model and serial number, so the right board or module is picked without guesswork. Coverage includes channel boards, power modules, connectors and the consumables that wear on a cycling line.
For multi-cabinet installations we agree a recommended spares list at order, sized to your channel count and the criticality of the test. Customers with an SLA can hold stock locally as part of the agreement.
| Part class | Examples | Typical dispatch | Notes |
|---|---|---|---|
| Channel board | Tester module, sense board | 48 h from regional stock | Serial-matched; calibration after replacement. |
| Power module | Regenerative stage, rectifier | 48 h–2 weeks | Higher-power modules may ship from the factory. |
| Consumables | Leads, clamps, fuses, fans | 48 h from regional stock | Recommended stock list issued at order. |
| Fixtures | Pouch clamps, prismatic trays | 1–3 weeks | Made to cell format; drawing approval required. |
Dispatch times are typical and depend on region and stock. Contractual terms are set in the service agreement.
Three audiences, three sessions. Delivered on site or remotely, in your language where a regional partner covers it.
Daily running: loading samples, starting and pausing schedules, reading alarms and handing over a shift without losing the thread.
Building protocols in BTS 9.1 — steps, loops, cut-offs and BMS signals via DBC — plus how to version a method before release.
First-line checks, channel verification and when to call service instead of opening the cabinet. Aimed at your own maintenance team.
Sessions are scheduled around commissioning or a shutdown window. Content and duration are agreed at quotation.
Support starts remote. Escalation to a field engineer follows when the fault cannot be cleared on the call.
| Priority | Situation | First response (typical) | Path to resolution |
|---|---|---|---|
| P1 | Line down, no testing possible | Same business day | Remote diagnosis, on-site escalation where regional coverage exists |
| P2 | Degraded operation or single-channel fault | Next business day | Remote fix or spare parts dispatch |
| P3 | Planned service, calibration booking | 2 business days | Scheduled visit or return-to-lab slot |
| P4 | Application and method questions | 3 business days | Engineer call-back or written guidance |
All response times are typical targets, not contractual guarantees. Final SLA terms, coverage hours and on-site attendance are confirmed in the service agreement at quotation. Regional coverage varies by location.
Warranty terms are set in your quotation and contract. This section describes how a claim is handled after you raise it.
Model, serial number, affected channel or module, what the system is doing and what changed. Attach a log export or photo where you have one.
An engineer reviews the record and the symptom, then confirms whether the fault is configuration, software or hardware.
If hardware is involved, we issue an RMA reference and agree whether a spare ships first or the module returns.
The repaired or replaced item is verified, and the affected channel group is checked and recalibrated where the measurement circuit changed.
If a fault falls outside the agreed warranty, we will say so before any chargeable work starts. Wear parts, consumables, site conditions and third-party modifications are assessed against the contract, not assumed either way.
Model · serial number · channel or module · symptom and timeline · log export or photo · site contact.
Response targets are listed under Support & SLA. Warranty period, coverage and freight terms are confirmed in the quotation and contract.
Installation and commissioning are quoted as a separate line so you can see the scope. It can be included in the order or delivered by a regional partner; either way it ends with a signed commissioning record.
Twelve months is the usual starting point, but the interval belongs to your quality system. Production lines with continuous cycling often choose a shorter interval; labs with occasional use may extend it after reviewing drift history.
Where a regional partner and the model allow it, yes. Otherwise the channel modules return to a calibration laboratory. The choice affects lead time and shipping, so it is agreed when the calibration is booked.
Our service scope covers NEWARE systems. Third-party equipment is evaluated case by case, and we will say plainly if it is outside our competence or spare-parts access.
Remote diagnosis confirms the fault, then a replacement board ships from regional stock. After replacement the affected channel group is verified, and calibration is scheduled if the board carries calibrated measurement circuitry.
Where a regional partner covers your language, yes. Otherwise training is delivered in English with translated materials. Confirm the language requirement in your enquiry so it is included in the service plan.
The evidence behind the certificate: a traceable chain, a stated interval, a defined uncertainty and a redacted sample. The certificate number is added when issued.
Calibration is performed in a CNAS-accredited laboratory whose quality system follows ISO/IEC 17025. The scope covers voltage and current channels; the certificate states as-found and as-left values with uncertainty.
Certificate no. On request
Certificate number and accreditation scope are supplied with the quotation and on request.
| Item | Typical arrangement | Record |
|---|---|---|
| Interval | 12 months from the last calibration; shorter intervals on request | Agreed in the service agreement |
| Expedite | Expedited calibration for production windows | Lead time confirmed at booking |
| Result | As-found and as-left values per channel group | Stated in the certificate |
| Uncertainty | Expanded uncertainty at k=2, by range | Stated in the certificate |
Example uncertainty format: ±(0.02% RD + 0.01% FS), k=2. Actual values depend on model, range and calibration point; treat this as an example, not a specification.
Certificate sample
Redacted for publication. A full example is available under NDA on request.
Support levels describe test capability, not certification of a completed test. Abuse and mechanical tests are outside the electrical test-system scope.
| Standard | Title | Support | Typical configuration |
|---|---|---|---|
| IEC 62660-1 | Secondary lithium-ion cells — performance testing | Supported | 5 V cell channels; 10–1000 Hz sampling; temperature chamber as required |
| IEC 62660-2 | Secondary lithium-ion cells — reliability and abuse testing | Configurable | Electrical stress and cycling only; thermal and mechanical abuse need dedicated safety equipment |
| UN 38.3 (T1–T5) | Transport testing of lithium cells and batteries | Configurable | T1, T2, T4 and T5 electrical profiles on test channels; T3 vibration and environmental steps require external equipment |
| ISO 12405-4 | Electrically propelled road vehicles — test specification for lithium-ion battery packs and systems | Configurable | Module/pack cycler plus chamber; pack-level mechanical and abuse steps are out of scope |
| SAE J2464 | Electric and hybrid vehicle battery abuse testing | Not supported | Abuse testing (crush, penetration, fire) is outside the test-system scope |
| GB/T 31484 | Cycle life requirements and test methods for traction battery packs and systems | Supported | Cell, module or pack channels with the cycle profile; chamber as required |
| GB/T 31486 | Electrical performance requirements and test methods for traction battery packs | Supported | Cell and module channels; voltage/current range configured to the pack |
Support levels are indicative and conservative. Final scope is confirmed against the configuration, the cell format and the tender documents.
Tell us your channel count, site location and calibration interval. We return a service scope with response targets, spares list and training plan — typically within one business day.
Talk to an engineer
Request a quote